List of all references

Country Project Year Specific features Track length
Austria Langenlebern 1989 Test track in the field 264 m
Austria Tauern Tunnel 1992 Tunnel modernisation track 2 2,629 m
Austria Helwag Bridge 1993 New bridge construction 52 m
Austria Galgenberg Tunnel 1996/

1997
New tunnel construction, bridge 11,040 m
Austria Römerberg Tunnel 1997 New tunnel construction, 638 m
Austria Zammer Tunnel 1998/

1999
New tunnel construction, 4,477 m
Austria Kaponig Tunnel 1999 New tunnel construction and bridge, 11,170 m
Austria By-pass Melk 1999/

2000
High speed line - Wachbergtunnel, Melker tunnel, bridge and earthwork, 8,612 m
Austria Wolfsgrubentunnel/Arlbergtunnel 1999/

2000
New tunnel construction, 3,730 m
Austria Sieberg Tunnel 2000/

2001
Tunnelneubau 12,902 m
Austria S7-Rennweg Airport 2001/

2002
New tunnel construction, 3,250 m
Austria Blisadona Tunnel 2002 New tunnel construction 4,865 m
Germany Berlin Main Railway Station (East-West-Connection) 2001/

2002
Bridges/ track base plate on slide bearings 50 joint crossing constructions 4,690 m
Austria Tauerntunnel 2002/

2003
Tunnel modernisation track 1 + 2 9,880 m
Austria Unterwalder Tunnel 2003 New tunnel construction 2,480 m
Austria Rohr connection 2003 New tunnel construction 1,691 m
Austria Wagram connection 2003 New tunnel construction 2,870 m
Austria Birgl- und Kennlach Tunnel 2004 New tunnel construction 2,650 m
Austria Pisten Tunnel S7 2005 New tunnel construction, 1,412 m
Germany Berlin Main Railway Station (North-South-Connection) 2002/

2006
New tunnel construction / big block outs 8,944 m
Austria Lainzer Tunnel 2006/

2007
New tunnel construction, 4,550 m
Austria Arlberg Tunnel 2007/

2009
Tunnel modernisation track 1 + 2, 20,812 m
Austria Stanser Tunnel 2010 New tunnel construction 1,109 m
Austria Koralmbahn Wettmannstätten 2010 High speed line tunnel and earthwork, 2,876 m
Austria Perschlingtal Package 7 2009/

2010
High speed line tunnel, 12,285 m
Austria Tullnerfeld Package 10.3 2010/

2011
High speed line - tunnel, bridge and earthwork 11,444 m
Austria Lainzer Tunnel 2010/

2012
New tunnel construction, 18,075 m
Austria Wienerwald Tunnel 2010/

2011
New tunnel construction on high speed line, 26,406 m
Slovenia Križiški Tunnel 2010/

2011
Tunnel modernisation track 1 + 2 826 m
Slovenia Jurgovski Tunnel 2010/

2011
Tunnel modernisation track 1 + 2 733 m
Slovenia Ležeški Tunnel 2010/

 

2011
Tunnel modernisation track 1 + 2 878 m
Austria Kundl/Radfeld - Baumkirchen 2010/

2012
New tunnel construction on high speed line, 69,879 m
Austria Ybbs-Amstetten = Hubertendorf - Blindenmarkt 2011/

2012
New tunnel construction on high speed line, 6,126.9 m
The Czech

Republic
Strelensky Tunnel 2012/

2013
Tunnel modernisation track 1 + 2 860m
Germany VDE 8.2 Erfurt - Leipzig/Halle Phase 2012/

2015
High speed line - tunnel, bridge and earthworks 179,352 m
Germany VDE 8.1 Ebensfeld – Erfurt

Section 2 Illmenau – Coburg
Phase 2012/

2017
High speed line - tunnel, bridge and earthworks 87,860 m
Germany VDE 8.1. Ebensfeld – Erfurt

Section 3 Coburg - Ebensfeld
2012/

2017
High speed line - tunnel, bridge and earthworks 43,840 m
Austria Hauptbahnhof Wien 2014 Slab track in tunnel 1,555 m
Slovakia Bratislava Tunnel

2014 Feste Fahrbahn im Tunnel 700 m
UK Winchburgh Tunnel

2015 Feste Fahrbahn im Tunnel 957 m
Austria Pummersdorfer Tunnel ( GZU GUM 6.2 )

2015 slab track in a new tunnel 7.392 m
Austria Radelleiten + Bründlkapellen Tunnel ( GZU GUW 5 )

2015/2016 slab track in a new tunnel 5.353 m
Austria Hengsberg Tunnel + Weitendorf Underpass

2016 Slab track in tunnel and on an underpass with Light Mass Spring System (LMSS) 3,276 m
UK Queen St Tunnel, Glasgow

2016 Slab track in tunnel 1,648 m
UK Gospel Oak, London

2016 Slab track 1,383 m
Katar Metro Doha)

2016/2018

under construction)

173.747 m
Total       782.293 m