Less labor intensive

Installation of Slab Track Austria Railway System is fast and precise. Due to the high degree of pre-fabrication the construction method requires less labor and follow-up work. Construction during track shutdowns is possible using the early strength of self-compacting concrete Track can be laid quickly with superior precision and with concreting work on site being kept to a minimum, concreting is completed expediently. Compared to other ballastless track systems, construction of slab Track Austria requires up to 50% less time.

Laying the rail-supporting slabs
Laying track slab - Berlin East-West